AluPro is a leading supplier of masts and towers in Poland.
For 15 years, we have been building Poland’s telecommunications infrastructure together with our customers. We specialize in the construction of aluminum masts and towers for the WISP, GSM, railway, and uniformed services sectors.
A proven product and a good understanding of customer needs
WHO WE ARE
Why is it worth trusting us?
AluPro is primarily people and the skills behind them. The team is built by an engineer from the Warsaw University of Technology - Faculty of Power and Aeronautical Engineering, a business specialist, a master's degree from the University of Warsaw and a civil engineer from the Gdańsk University of Technology. Specialist education and experience in production make our products particularly good.
AluPro would not exist without our employees – locksmiths, welders, installers. The production staff is subject to precise selection. Those who join the team undergo training. All welders have TUV exams.

Our newest products
WHAT DO WE DO?
We are specialists in
aluminum production

Masts and Towers
We manufacture radio masts, radio towers, and measurement masts up to 160 meters in height. We manufacture them in steel and aluminum. Our product line ranges from the economical M400 series to the high-end M1000 series. All products can be adapted to the appropriate wind zone and the planned antenna surface load.

Field Installation
We deal with the installation of our products, basic work at heights, installation of antennas and cabling. We service masts manufactured by AluPro as well as other manufacturers as part of warranty and post-warranty service

Stage and Fair
We design and manufacture stage trusses, crane systems, gates, and brackets. Our products are compatible with Milos, Prolyte, EuroTruss, GlobalTruss, and AluStage connection systems. We adapt to the solutions our customers already have. We specialize in systems tailored to specific interiors (“custom” solutions—clubs, nightclubs).

Design Office
We design custom truss structures, we cooperate with design offices. In today's complex world, specialization is becoming increasingly important. Our partners can reach for our many years of expertise in the field of design and construction of masts and telecommunications towers. We provide a database of hundreds of ready-made projects, we prepare specialist solutions. Are you designing and your project requires mast infrastructure? Be sure to contact us.

AluPro is an individual approach to the client
What sets AluPro apart from other companies is the close contact our customers have with the decision-makers at our company. We don’t employ too many salespeople—as the owners of AluPro, we believe that building long-term business relationships is at the core of our mission and is our top priority. We are delighted when our products solve the unique challenges faced by the companies we work with. Our superpower is the ability to tailor any product to a customer’s specifications, even in small batches.
So what sets us apart?
- You work with people who actually make decisions
- You get specialist support and design consulting
- We can freely modify all our products to suit your expectations.
QUALITY CONTROL AND PROCEDURES
We trust our process
production control
1.
Storage of unprocessed aluminum
Each delivery from an aluminum foundry differs in material specifications (e.g., tensile strength of the metal). In order to track issues (e.g., mismatch between description and grade), these batches of material must be separated and appropriately labeled.
- We use three separate warehouse areas to store AW6082, AW6060 and AW6063 grade aluminum separately.
- Each area has shelves that separate different deliveries.
2.
Welding process control
Welding quality is essential for product safety. Welders must be aware of the welding instructions for each product, must be supervised, and welds must be Finally checked. when processing metal, aluminum grades cannot be mixed randomly, because not all grades combine well.
- Each product has welding instructions available at the welding station.
- Employee hierarchy facilitates control and correction.
- Approximately 30% of each batch of products undergoes visual inspection according to TUV VT2 specifications.
3.
Design according to Eurocode
Another important safety factor is the design itself. All of our designs undergo static calculations and verification by an engineer with unlimited building permits.
Our designs are fully compliant with applicable PN/EN standards and the Eurocode. We include the relevant Declarations of Conformity with our products.
- All designs are created in a 3D CAD environment.
- All our projects undergo Autodesk Robot analysis and FEM analysis.
- Upon request, AluPro can provide all the calculations needed for the building permit process in most eU member States.
15 years in the aluminum production business
350+
Number of customers served annually
430
Projects implemented in Poland and the EU
22
Countries where our masts operate
IN THE EYES OF OUR CUSTOMERS
What they say about us
“AluPro is a proven partner on the production services market. Their masts are distinguished by the quality of their welds. This is good equipment for years, made without unnecessary savings or “shortcuts”. We have been installing Alupro masts for a long time and thanks to this cooperation, the percentage of complaints is negligible”

Miroslaw Szabucki
Masztpol ・ Owner
“The Sochocin NET network was built almost entirely on AluPro products. I installed their first masts in 2014 and today, 10 years later, they are still working without any problems. The quality gives me peace of mind. There is nothing worse in business than patching up networks after spring storms.”

Adam Bugajewski
Sochocin Net ・Owner
OUR LATEST INSTALLATIONS
Tower T1200-45 South West PL
Ballast Masts Modlin Airport
Reinforced version of the T1000-15 turret for the German market
Painted steel mast on the Police building in Płock
Szymany air traffic control tower
Mast M1000-28 Sierpc
Fully extendable t1000-9.9A Tower
Construction of the T500-20 lighting tower
M750 Mast Service in Kędzierzyn-Koźle
M1000-40 mast Service
Service in Iłowa, M500-16
Steel tower H=30 for a very small plot
A ramp that levels the dock for buses
Advertising structure “Rain of Prizes”
Aluminum cable ladder system
Platform for high jumps
COMPANIES THAT TRUST US
Here are the clients we could help
help with our services and products

Grow with AluPro

If you are a design office or a branch designer – we will provide you with all the support you need. We consult on the planned solutions, suggest alternative methods of foundation of the structure, provide our database of projects in DWG formats or 3D solids, e.g. STEP. You can also subcontract us to complete the entire mast part of your project.

If you are an Internet service provider (WISP) or GSM or GSM-R network integrator, contact us to learn about our prices for long-term cooperation. We sign volume contracts with a rate guarantee for a set period. With us, you can increase the reliability of service and optimize the price of network expansion.

If you are a wholesaler in the industry and you sell telecommunications equipment and would like to secure another branch of income - consider cooperation with Alupro. We have an interesting case study of what such cooperation could look like - for many years we have been supplying equipment to one of the largest wholesalers in the industry in Wielkopolska. Talk to us about it.

KNOWLEDGE ZONE
Our latest articles and Q&A
-

I'm starting a mast-building project—what do you need to know to help me?
Read more: I'm starting a mast-building project—what do you need to know to help me?The construction of telecommunications towers and masts is a highly specialized field. In Poland, only a dozen or so companies carry out this work independently, while several dozen others operate by subcontracting to the actual manufacturers. Due to the narrow scope of specialization, most designers, architects, and civil engineers do not have extensive experience with this type of project. This post aims to clearly and concisely present…
-

Cooperation with SpaceForest
Read more: Cooperation with SpaceForestIn 2019, we established an interesting cooperation with the then emerging company SpaceForest. Based on their internal design, we made - in accordance with our specialty - the truss of the Perun rocket launcher. Made to "space" standards, the truss was created from a special grade of hardened AW6082 aluminum and extra-thick tubes for high stiffness at the crucial moment of highest load at launch. An interesting feature...
-

Assembly for chemical anchors - description of the technique
Read more: Assembly for chemical anchors - description of the technique.Most of our wall-mounted masts are installed using chemical anchors and threaded rods. This is a very convenient and durable method, though it is sensitive to installation errors. The forces acting on the bolts—especially for taller and more heavily loaded masts—can reach values measured in metric tons, so the quality of the mounting is crucial. General note: if you are not a professional installer…
-

Optimization of the height of masts for the radio link.
Read more: Optimization of the height of masts for the radio link.Designing a radio link network requires ensuring visibility between antennas and the presence of an unobstructed Fresnel zone. Altitude maps, drones and meteorological balloons are used for field verification. The price of the service is PLN 3,200 net per day.
-

Reactions to building structure – what should I know?
Read more: Reactions to building construction – what should I know?Customers often wonder why the mast attachment is more expensive than the mast itself. The values of the tearing and driving forces in the roof quoted in the static calculations show how important proper anchoring is, which often requires major construction work and specialist solutions, individually adapted to each building.
-

Anti-fall system – what is it and how does it work?
Read more: Anti-fall system – what is it and how does it work?Working on towers and masts can be dangerous. Manufacturers’ recommendations are clear: work at heights should not be performed when wind speeds exceed 5 m/s. Safety harnesses or mountaineering harnesses are helpful in everyday work—they significantly increase safety, albeit at the expense of comfort. Changing position on a mast is particularly cumbersome: every step requires repositioning the lanyard, which in practice leads even experienced…
-

I am putting a mast/tower on the ground – how should I foundation it?
Read more: I am putting a mast/tower on the ground – how should I foundation it?The general rule is that a foundation should not extend below the groundwater level. If the groundwater table is shallow, the most common solution is a foundation slab weighted down with earth fill or shallowly buried precast elements (so-called “mushrooms” from the F series, e.g., those manufactured by Elbud Gdańsk). Cast-in-place slabs are also used in mountainous areas, where just below the ground surface there are…



