Prefabricated concrete foundations of the EF series
Precast concrete foundations are one of the most common and cost-effective foundation techniques for medium-sized towers ranging from 28 to 45 meters in height, as well as for large guyed masts.
Goes well with
Only relationships confirmed in the descriptions and catalog.
Accessories and parts for this product
Aluminum lattice mast M400EF 115/200 ≤40 m, EF 150/200 ≤60 m, EF 160/230 ≤70 m, EF 180/250 ≤90 m
Aluminum lattice mast M500EF 115/200 ≤40 m, EF 150/200 ≤60 m, EF 160/230 ≤70 m, EF 180/250 ≤90 m
Aluminum lattice mast M750EF 115/200 ≤40 m, EF 150/200 ≤60 m, EF 160/230 ≤70 m, EF 180/250 ≤90 m
Aluminum lattice mast M1000EF 115/200 ≤40 m, EF 150/200 ≤60 m, EF 160/230 ≤70 m, EF 180/250 ≤90 m
T1000 series aluminum telecommunications lattice towerEF 115/200: T1000 up to 24 m; 150/200: up to T1000-28; 160/230: up to T1000-30; 180/250: up to T1000-36 (up to 45 m under certain conditions)
T500 series aluminum telecommunications lattice towerEF 115/200: all T500 versionsAlternatives
MB-1MB-1 Mast Foundation System (buried base)Masts: ground anchors (without heavy equipment) vs. prefabricated masts (crane/HDS)
GA-1GA-1 Mast Foundation System (buried anchor)Masts: ground anchors (without heavy equipment) vs. prefabricated masts (crane/HDS)
AC Series Aluminum and Steel Backfill Foundationbackfill foundation instead of precast / concrete
GS Series Ground Screwground anchors: only for small structures, cohesive soils
AFH series concrete anchorscast-in-place slab with anchors vs. precast slab
AFL series concrete anchorscast-in-place slab with anchors vs. precast slabTechnical Specifications
Basic Technical Information
| Foundation Size | Reinforcing steel weight [kg] | Weight [kg] | Base diameter [mm] | Cone height [mm] | Compatibility for masts* | Compatibility for mast shaft and guy wires** | Tower Compatibility*** |
|---|---|---|---|---|---|---|---|
| EF 115/200 | 31.5 | 860 | 1150 | 2150 | up to 40 meters | all versions | T500: T1000 up to 24 meters |
| EF 150/200 | 49.4 | 1220 | 1500 | 2150 | up to 60 meters | x | for T1000-28 |
| EF 160/230 | 66.3 | 1515 | 1600 | 2450 | up to 70 meters | x | for T1000-30 |
| EF 180/250 | 81.8 | 1830 | 1800 | 2450 | up to 90 meters | x | up to T1000-36 (up to 45 meters conditionally) |
* additional data available for architects
** compatibility data assumes maximum permissible antenna load, average soil conditions, groundwater level below the foundation base, wind and icing zone I
*** AluPro recommends static calculations and consultations with an architect for each installation to ensure optimal and safe selection of the foundation version
Description
Precast concrete foundations are one of the most common and cost-effective foundation techniques for medium-sized towers ranging from 28 to 45 meters in height, as well as for large guyed masts. They are worth using wherever soil conditions permit (groundwater level below the foundation base, non-plastic soil) and where heavy equipment (HDS, crane) is readily available. The main advantage of prefabricated elements is quick installation—even a foundation for a large structure can be completed by a team of several people in one to two days, and the structure can be loaded almost immediately. The disadvantages include relatively expensive delivery due to the significant weight and volume, the difficulty of positioning the elements in the excavation, the need for fairly precise preparation, leveling, and hardening of the excavation bottom with dry concrete, and finally, the difficult and precise positioning of the foundations relative to one another so that they will later fit the planned—and most often already constructed—tower structure. Fortunately, this last point does not apply to guyed masts. In general, it is best to leave work with precast foundations to a specialized team experienced in working with this solution—the advantages mentioned earlier still make precast elements the solution of first choice in many of our clients’ projects.
Availability and installation method
- Prefabrication time: 4 weeks,
- Variable stock level,
- The product is factory protected against water,
- Should be installed above the groundwater level,
- The prefabricated element can be installed on the ground surface and covered with embankment,
- You should always consult the choice of foundation and its installation method with a local architect,
- Fill the bottom of the trench with a 20 cm layer of gravel, then a 10 cm layer of dry concrete. Concrete should be leveled to create a flat surface for foundations,
- The foundation procedure does not apply to prefabricated elements used as guy anchors for masts,
- The foundation hinge for the tower is included if the tower and foundation are ordered together